Customization: | Available |
---|---|
Application Fields: | Chemical |
Certification: | ISO |
Still deciding? Get samples of US$ 4300/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
LNG BOG Helium Recovery System
LNG BOG Helium-Hydrogen Recovery System Process Input Parameters | ||||||
Pressure | 18~20barg | |||||
Temperature | 20ºC | |||||
Raw Helium Flow Rate | 300Nm3/h (7200Nm3/day)(Operational Flexibility: 50%~110%) | |||||
Composition | CH | CH | N | H0 | Hz | CO2 |
Composition (mol/mol%) | 2 | 0 | 92.57 | 4.38 | 1.05 | 0 |
Integrated Utilization System Process Input Parameters for Natural Gas/Coalbed Methane/Shale Gas | |||||||
Pressure | 60barg | ||||||
Temperature | 25ºC | ||||||
Raw Helium Flow Rate | 50000Nm3/h(Operational Flexibility: 50%~110%) | ||||||
Composition | CH | C2H6 | CHy (x>2) | N2 | He | H2 | CO2 |
Composition (mol/mol%) | 86.35 | 7 | 1 | 0.6 | 0.04 | 0.01 | 5 |